{
  "asset_id": "P7789",
  "asset_name": "Gasene Gas Pipeline GASCAC",
  "asset_type": "Natural Gas Transmission Pipeline",
  "operating_status": "operating",
  "operating_sub_status": "operating",
  "country": "Brazil",
  "state_province": "Espírito Santo",
  "latitude": null,
  "longitude": null,
  "capacity_value": 7.3,
  "capacity_unit": "bcm/y",
  "wiki_url": "https://www.gem.wiki/Gasene_Gas_Pipeline",
  "location_id": "P7789",
  "unit_id": null,
  "unit_name": "GASCAC",
  "source_id": 3,
  "url": "/assets/P7789",
  "ownership_graph_url": "/ownership/graph?root=P7789&direction=up",
  "eventual_owners_url": "/owners?asset_id=P7789",
  "project_name": "Gasene Gas Pipeline",
  "upstream_entity_count": 14,
  "gas_pipeline_fields": {
    "cancelledyear": null,
    "capacity": "20",
    "capacityboed": "117660",
    "capacitybcm_y": "7.3",
    "capacityunits": "MMSCMD",
    "costusd": "--",
    "countriesorareas": "Brazil",
    "diameter": "28",
    "diameterunits": "in",
    "endcountryorarea": "Brazil",
    "endlocation": "EDG Catu",
    "endprefecture_district": "Pojuca",
    "endregion": "Americas",
    "endstate_province": "Bahia",
    "endsubregion": "Latin America and the Caribbean",
    "fidstatus": null,
    "fidyear": null,
    "fuel": "Gas",
    "fuelsource": null,
    "lastupdated": "2025-09-19",
    "lengthestimatekm": "1064.33",
    "lengthknownkm": "958.2",
    "lengthmergedkm": "958.2",
    "otherenglishnames": "Southeast Northeast Interconnection Gas Pipeline, Gasoduto da Integração Sudeste-Nordeste",
    "otherlanguageprimarypipelinename": "Gasoduto Gasene",
    "otherlanguagesegmentname": "GASCAC",
    "owner": "CDPQ [50.00%]; Engie SA [32.50%]; Engie Brasil Energia [17.50%]",
    "pci3": null,
    "pci4": null,
    "pci5": null,
    "pci6": null,
    "parent": "unknown [unknown %]",
    "parententityids": "unknown",
    "pipelinename": "Gasene Gas Pipeline",
    "projectid": "P7789",
    "projectlevelcost": null,
    "projectlevelcostunits": null,
    "routeaccuracy": "very high (within meters)",
    "routetype": "Mapped route (at any accuracy)",
    "segmentname": "GASCAC",
    "shelvedyear": null,
    "startcountryorarea": "Brazil",
    "startlocation": "UTG Cacimbas",
    "startprefecture_district": "Linhares",
    "startregion": "Americas",
    "startstate_province": "Espírito Santo",
    "startsubregion": "Latin America and the Caribbean",
    "startyear1": "2010",
    "startyear2": null,
    "startyear3": null,
    "status": "operating",
    "stopyear": null,
    "wiki": "https://www.gem.wiki/Gasene_Gas_Pipeline",
    "unit_name": "GASCAC",
    "wiki_url": "https://www.gem.wiki/Gasene_Gas_Pipeline",
    "countries": "[\"Brazil\"]"
  },
  "countries": [
    "Brazil"
  ]
}