{
  "asset_id": "P3137",
  "asset_name": "Alexandroupolis INGS Terminal Pipeline",
  "asset_type": "Natural Gas Transmission Pipeline",
  "operating_status": "operating",
  "operating_sub_status": "operating",
  "country": "Greece",
  "state_province": null,
  "latitude": null,
  "longitude": null,
  "capacity_value": 8.3,
  "capacity_unit": "bcm/y",
  "wiki_url": "https://www.gem.wiki/Alexandroupolis_INGS_Terminal_Pipeline",
  "location_id": "P3137",
  "unit_id": null,
  "unit_name": null,
  "source_id": 3,
  "url": "/assets/P3137",
  "ownership_graph_url": "/ownership/graph?root=P3137&direction=up",
  "eventual_owners_url": "/owners?asset_id=P3137",
  "project_name": "Alexandroupolis INGS Terminal Pipeline",
  "upstream_entity_count": 42,
  "gas_pipeline_fields": {
    "cancelledyear": null,
    "capacity": "8.3000000000000007",
    "capacityboed": "133777.81",
    "capacitybcm_y": "8.3000000000000007",
    "capacityunits": "bcm/y",
    "costusd": "87200000",
    "countriesorareas": "Greece",
    "diameter": "762",
    "diameterunits": "mm",
    "endcountryorarea": "Greece",
    "endlocation": "Amfitriti",
    "endprefecture_district": null,
    "endregion": "Europe",
    "endstate_province": null,
    "endsubregion": "Southern Europe",
    "fidstatus": "FID",
    "fidyear": null,
    "fuel": "Gas",
    "fuelsource": "Alexandroupolis LNG Terminal",
    "lastupdated": "2025-09-16",
    "lengthestimatekm": "27.75",
    "lengthknownkm": "28",
    "lengthmergedkm": "28",
    "otherenglishnames": null,
    "otherlanguageprimarypipelinename": null,
    "otherlanguagesegmentname": null,
    "owner": "Gastrade S.A [100.00%]",
    "pci3": null,
    "pci4": "yes",
    "pci5": null,
    "pci6": null,
    "parent": "Bulgarian Energy Holding EAD [20.00%]; Depa Emporias SA [20.00%]; Gaslog Ltd [20.00%]; natural person(s) [20.00%]; Snam SpA [7.20%]; Hellenic Gas Transmission System Operator SA [6.80%]; Enagas Internacional SLU [2.40%]; Fluxys Europe SA [2.40%]; DAMCO Energy SA [1.30%]",
    "parententityids": "E100001014819",
    "pipelinename": "Alexandroupolis INGS Terminal Pipeline",
    "projectid": "P3137",
    "projectlevelcost": null,
    "projectlevelcostunits": null,
    "routeaccuracy": "medium",
    "routetype": "Mapped route (at any accuracy)",
    "segmentname": null,
    "shelvedyear": null,
    "startcountryorarea": "Greece",
    "startlocation": "Alexandroupolis",
    "startprefecture_district": null,
    "startregion": "Europe",
    "startstate_province": null,
    "startsubregion": "Southern Europe",
    "startyear1": "2024",
    "startyear2": null,
    "startyear3": null,
    "status": "operating",
    "stopyear": null,
    "wiki": "https://www.gem.wiki/Alexandroupolis_INGS_Terminal_Pipeline",
    "unit_name": null,
    "wiki_url": "https://www.gem.wiki/Alexandroupolis_INGS_Terminal_Pipeline",
    "countries": "[\"Greece\"]"
  },
  "countries": [
    "Greece"
  ]
}