{
  "asset_id": "P100000121040_U100000143460",
  "asset_name": "BAP Al-Khair steel plant unknown DRI (1)",
  "asset_type": "Iron & Steel Plant",
  "operating_status": "planned",
  "operating_sub_status": "announced",
  "country": "Saudi Arabia",
  "state_province": "Eastern Province",
  "latitude": 27.502597,
  "longitude": 49.180369,
  "capacity_value": 2500.0,
  "capacity_unit": "ttpa",
  "wiki_url": "https://www.gem.wiki/BAP_Al-Khair_steel_plant",
  "location_id": "P100000121040",
  "unit_id": "U100000143460",
  "unit_name": "unknown DRI (1)",
  "source_id": 10,
  "url": "/assets/P100000121040_U100000143460",
  "ownership_graph_url": "/ownership/graph?root=P100000121040_U100000143460&direction=up",
  "eventual_owners_url": "/owners?asset_id=P100000121040_U100000143460",
  "project_name": "BAP Al-Khair steel plant",
  "upstream_entity_count": 5,
  "iron_steel_plant_fields": {
    "%_dri": null,
    "%_hbi": null,
    "%_basic_merchant_pig_iron": null,
    "%_granulated_pig_iron": null,
    "%_known_total": null,
    "%_other_iron": null,
    "%_pig_iron_unknown_if_basicmerchant_or_granulated": null,
    "%_scrap": null,
    "%_sponge_iron_unknown_if_dri_or_hbi": null,
    "announced_date": "45047.0",
    "announced_date_plant": "45047.0",
    "ccs_ccus": "N/A",
    "category_steel_product": "finished rolled",
    "coking_plant_capacity_thousand_tonnes_per_annum": "N/A",
    "construction_date": "unknown",
    "construction_date_plant": "unknown",
    "coordinate_accuracy": "approximate",
    "coordinates": "27.5025970, 49.1803690",
    "country_area": "Saudi Arabia",
    "country_area_plant": "Saudi Arabia",
    "current_capacity_thousand_tonnes_per_annum": "2500.0",
    "current_or_initial_reductant": "gas",
    "current_or_initial_hydrogen_reductant_color": "N/A",
    "current_size": null,
    "current_size_m3": null,
    "current_size_tonnes": null,
    "current_size_unit": null,
    "ferronickel_capacity_thousand_tonnes_per_annum": "N/A",
    "furnace_diameter": "unknown",
    "furnace_height": "unknown",
    "furnace_manufacturer": "unknown",
    "furnace_model": "unknown",
    "furnace_type": "shaft furnace",
    "future_hydrogen_reductant_color": "N/A",
    "gem_plant_id": "P100000121040",
    "gem_unit_id": "U100000143460",
    "gem_wiki_page": null,
    "gem_wiki_page_1": null,
    "gem_wiki_page_plant": "https://www.gem.wiki/BAP_Al-Khair_steel_plant",
    "gas_reductant": "syngas (reformed methane)",
    "hydrogen_reductant_conversion_date": "N/A",
    "hydrogen_reductant_status": "unknown",
    "iso_14001": "unknown",
    "iso_50001": "unknown",
    "idled_date": "unknown",
    "idled_date_plant": "unknown",
    "iron_ore_source": "unknown",
    "location_address": "Ras Al-Khair, Industrial City, Eastern Province, Saudi Arabia",
    "location_address_2": null,
    "main_production_equipment": "DRI; EAF",
    "met_coal_source": "unknown",
    "most_recent_relining": null,
    "municipality": "Ras Al-Khair",
    "other_plant_names": null,
    "other_plant_names_2": null,
    "owner": "Public Investment Fund (Saudi Arabia); Baoshan Iron & Steel Co Ltd; Saudi Arabian Oil Co",
    "owner_2": "宝山钢铁股份有限公司; صندوق الاستثمارات العامه",
    "owner_gem_entity_id": "E100000001358; E100000122571; E100000000888",
    "owner_permid": "4297338934; 4295864974; 4298459348",
    "parent": "Baoshan Iron & Steel Co Ltd [100.0%]; Public Investment Fund (Saudi Arabia) [100.0%]; Saudi Arabian Oil Co [100.0%]",
    "parent_gem_entity_id": "E100000122571 [100.0%]; E100000001358 [100.0%]; E100000000888 [100.0%]",
    "parent_permid": "4295864974 [100.0%]; 4297338934 [100.0%]; 4298459348 [100.0%]",
    "pelletizing_plant_capacity_thousand_tonnes_per_annum": "unknown",
    "plant_age": "0.0",
    "plant_name": "BAP Al-Khair steel plant",
    "plant_name_2": "باب الخير",
    "power_source": "unknown",
    "pre_retirement_announcement_date": null,
    "pre_retirement_announcement_date_1": null,
    "pre_retirement_announcement_date_plant": "unknown",
    "region": "Middle East",
    "responsiblesteel_certification": "no",
    "retired_date": "unknown",
    "retired_date_plant": "unknown",
    "soe_status": "Partial",
    "scrap_based": null,
    "sinter_plant_capacity_thousand_tonnes_per_annum": "unknown",
    "start_date": "2026.0",
    "start_date_plant": "2026.0",
    "steel_products": "plate",
    "steel_sector_end_users": "building and infrastructure, transport",
    "subnational_unit": "Eastern Province",
    "unit_age": "0.0",
    "unit_name": "unknown DRI (1)",
    "unit_status": "announced",
    "workforce_size": "unknown",
    "furnace_category": "dri",
    "unit_name_2": "unknown DRI (1)",
    "wiki_url": "https://www.gem.wiki/BAP_Al-Khair_steel_plant",
    "relining_statuses": null
  }
}