{
  "asset_id": "P100000120969_U100000143440",
  "asset_name": "Cleveland-Cliffs Toledo DRI plant unknown DRI (1)",
  "asset_type": "Iron & Steel Plant",
  "operating_status": "operating",
  "operating_sub_status": "operating",
  "country": "United States",
  "state_province": "Ohio",
  "latitude": 41.672816,
  "longitude": -83.477833,
  "capacity_value": 1900.0,
  "capacity_unit": "ttpa",
  "wiki_url": "https://www.gem.wiki/Cleveland-Cliffs_Toledo_DRI_plant",
  "location_id": "P100000120969",
  "unit_id": "U100000143440",
  "unit_name": "unknown DRI (1)",
  "source_id": 10,
  "url": "/assets/P100000120969_U100000143440",
  "ownership_graph_url": "/ownership/graph?root=P100000120969_U100000143440&direction=up",
  "eventual_owners_url": "/owners?asset_id=P100000120969_U100000143440",
  "project_name": "Cleveland-Cliffs Toledo DRI plant",
  "upstream_entity_count": 5,
  "iron_steel_plant_fields": {
    "%_dri": null,
    "%_hbi": null,
    "%_basic_merchant_pig_iron": null,
    "%_granulated_pig_iron": null,
    "%_known_total": null,
    "%_other_iron": null,
    "%_pig_iron_unknown_if_basicmerchant_or_granulated": null,
    "%_scrap": null,
    "%_sponge_iron_unknown_if_dri_or_hbi": null,
    "announced_date": "unknown",
    "announced_date_plant": "unknown",
    "ccs_ccus": "N/A",
    "category_steel_product": "crude",
    "coking_plant_capacity_thousand_tonnes_per_annum": "N/A",
    "construction_date": "unknown",
    "construction_date_plant": "unknown",
    "coordinate_accuracy": "exact",
    "coordinates": "41.6728160, -83.4778330",
    "country_area": "United States",
    "country_area_plant": "United States",
    "current_capacity_thousand_tonnes_per_annum": "1900.0",
    "current_or_initial_reductant": "gas",
    "current_or_initial_hydrogen_reductant_color": "N/A",
    "current_size": null,
    "current_size_m3": null,
    "current_size_tonnes": null,
    "current_size_unit": null,
    "ferronickel_capacity_thousand_tonnes_per_annum": "N/A",
    "furnace_diameter": "unknown",
    "furnace_height": "unknown",
    "furnace_manufacturer": "Midrex",
    "furnace_model": "unknown",
    "furnace_type": "shaft furnace",
    "future_hydrogen_reductant_color": "unknown",
    "gem_plant_id": "P100000120969",
    "gem_unit_id": "U100000143440",
    "gem_wiki_page": null,
    "gem_wiki_page_1": null,
    "gem_wiki_page_plant": "https://www.gem.wiki/Cleveland-Cliffs_Toledo_DRI_plant",
    "gas_reductant": "syngas (reformed methane)",
    "hydrogen_reductant_conversion_date": "unknown",
    "hydrogen_reductant_status": "capable",
    "iso_14001": "unknown",
    "iso_50001": "unknown",
    "idled_date": "unknown",
    "idled_date_plant": "unknown",
    "iron_ore_source": "various owned or partially owned mines in Michigan and Minnesota and one in West Virginia (Hibbing Taconite, Minorca, Northshore, Tilden, and United Taconite mines) totalling 20,300 thousand metric tonnes of ore mined for Cleveland Cliffs in 2022",
    "location_address": "330 Millard Ave, Toledo, OH 43605, United States",
    "location_address_2": null,
    "main_production_equipment": "DRI",
    "met_coal_source": "unknown",
    "most_recent_relining": null,
    "municipality": "Toledo",
    "other_plant_names": null,
    "other_plant_names_2": null,
    "owner": "Cleveland-Cliffs Inc",
    "owner_2": null,
    "owner_gem_entity_id": "E100001000649",
    "owner_permid": "4.295903753E9",
    "parent": "Cleveland-Cliffs Inc [100.0%]",
    "parent_gem_entity_id": "E100001000649 [100.0%]",
    "parent_permid": "4295903753 [100.0%]",
    "pelletizing_plant_capacity_thousand_tonnes_per_annum": "unknown",
    "plant_age": "6.0",
    "plant_name": "Cleveland-Cliffs Toledo DRI plant",
    "plant_name_2": null,
    "power_source": "unknown",
    "pre_retirement_announcement_date": null,
    "pre_retirement_announcement_date_1": null,
    "pre_retirement_announcement_date_plant": "unknown",
    "region": "North America",
    "responsiblesteel_certification": "no",
    "retired_date": "unknown",
    "retired_date_plant": "unknown",
    "soe_status": "N/A",
    "scrap_based": null,
    "sinter_plant_capacity_thousand_tonnes_per_annum": "unknown",
    "start_date": "2020",
    "start_date_plant": "2020",
    "steel_products": "HBI",
    "steel_sector_end_users": "unknown",
    "subnational_unit": "Ohio",
    "unit_age": "6",
    "unit_name": "unknown DRI (1)",
    "unit_status": "operating",
    "workforce_size": "166.0",
    "furnace_category": "dri",
    "unit_name_2": "unknown DRI (1)",
    "wiki_url": "https://www.gem.wiki/Cleveland-Cliffs_Toledo_DRI_plant",
    "relining_statuses": null
  }
}